Search Results

Search:

Your search for Nipissing returned 5 entries.

Table of Contents

Title Page
Preface
Introduction
1 A place called Hamilton.
2 Public Works and Private Enterprise
3 Port Hamilton
4 1837-1839
5 Ericsson Wheels
6 1844-1847
7 Good Times in Port
8 Boom Town Days
9 Depression Years
10 Better Times Ahead
11 1867-1870
12 Prosperity for the Shipbuilders
13 The Second Railway Building Era
14 1884-1888
15 The Electric Era
16 The Iron Age
Table of Illustrations
Index
Nipissing
1   beam engine, 24 x 96" , for the steamboat NIPISSING, being built at Muskoka Wharf for A. P. Cockburn,
2   and was released later in the day by the dredge NIPISSING. This dredge had just completed the clearing of a
3   trade had been very good. The Government dredge NIPISSING was in the harbour and had cleaned out the Rush
4   Government dredge NIPISSING was working in the Burlington Canal and was
5   laid up for the winter. The Government dredges NIPISSING and ONTARIO were both laid up at McIlwraith's

A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z 
Search index by Categories of entries:

Return to Home Port


This volume is copyright The Estate of Ivan S. Brookes and is published with permission of the Estate. The originals are deposited in the Special Collections of the Hamilton Public Library.