Table of Contents
|
- Hamilton Radial Electric Railway
- 1 Hamilton Radial Electric Ry. Co. acquired a right of way across Burlington Beach,
- 2 in the form of a brick power house for the HamiltonRadial Electric Ry. The boilers for this plant were on their way
- 3 would be electrically worked as soon as the Hamilton Radial Railway reached the Canal. Further north along the Beach,
- 4 day Car No. 20 made a test run over the Hamilton Radial Electric Railway. The tracks were finished on the bridge, but the
- 5 the schooner ELLA MURTON. An announcement by the Hamilton Radial Electric Railway, Alex. Turner, president, indicated that they
- 6 and on the 22 August, it was out of service. The Hamilton Radial Electric Ry. arranged for the steam launch MAPLE LEAF to ferry
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Return to Home Port
This volume is copyright The Estate of Ivan S. Brookes and is published
with permission of the Estate. The originals are deposited in the Special
Collections of the Hamilton Public Library.
|