|
|
|||
|
Table of Contents |
Cement Carriers
The discharge gear consists of a Sauerman scraper, supported on an overhead trackway, situated in each tunnel and hauled along the scraper tunnels by steel wires led to two electric haulages. These drag the scrapers up an inclined path and discharge the cement into a hopper bunker which, in turn, feeds it through a sliding gate into the archimedean screw of an electrically driven highspeed Fuller Kenyon cement pump. The cement is then blown overboard through an 8-in-diameter compressed-air discharge line (11).
Previous Next Return to Home Port This paper was presented at a meeting of the Society of Naval Architects and Marine Engineers and is reproduced with permission. |